Hi All,
We have a scenario of two backend systems connected to SRM system.
Materials are created with the same number in both the ECC systems and replicated to SRM system .
Materials are updated in COMM_PRODUCT in SRM with the respective logical system.
But when we creating a local contract by adding the same material system is throwing a dump .
system is not able to recognize the logical system for the material and material group linked.
Please let me us know if you have faced any such issue
Thanks
Rajesh